Rapid Tooling
Rapid Tooling reduces the time and cost for mold manufacturing relative to traditional machining methods. Generally, the lead time for simple structure parts (with tooling life range as high as 100,000 shorts) is 3~10 days, and cost reduction is 15%~30% of conventional tooling.
https://bit.ly/2Zg7nw3