https://www.selleckchem.com/products/pk11007.html
The propensity score (PS) based method has been increasingly used in road safety evaluation studies. However, several major considerations regarding its implementation arise when using the PS method. First, as is well known, the PS method is 'data hungry' in terms of the number of treated and control units, however, it is sometimes difficult and time-consuming to construct a large sample in road safety studies. It would be helpful to better understand how to choose a proper sample size, as well as the ratio of the number of treated unit